Fujiyama Power Systems to set up 1.2 GW solar cell plant in Madhya Pradesh

Fujiyama Power Systems is establishing a 1.2 GW solar cell manufacturing facility in Madhya Pradesh, a move aimed at strengthening its value chain and expanding in-house solar capabilities.

— FiledSun, 27 Sept, 2026, 13:21 IST·First seen Sun, 27 Sept, 2026, 13:19 IST·Source Moneycontrol · Business

What happened

Fujiyama Power Systems is setting up a 1.2 GW solar cell manufacturing plant in Madhya Pradesh to strengthen its value chain.

Key facts

  • 1.2 GW

Why this matters

By adding cell manufacturing, Fujiyama becomes a more integrated solar platform, potentially creating partnership, acquisition and downstream expansion opportunities across the domestic value chain.

What to watch

  • Land acquisition, project commissioning date, and disclosed capex for the 1.2 GW facility.
  • Equipment supplier selection and cell technology choice, such as TOPCon or other higher-efficiency formats.
  • Government incentive approvals, domestic-content certification, and procurement-policy changes.
  • Initial production yields, capacity-utilization updates, and customer offtake agreements.
  • Expansion of module, inverter, battery, or EPC capacity that indicates a broader integrated-solar strategy.
  • Changes in imported cell/module prices and tariffs that affect the economics of domestic production.
  • Secure technology, equipment, wafer, and other upstream supply partnerships for the cell line.
  • Expand module assembly, testing, and quality-control capacity to consume internally produced cells.
  • Build dealer, EPC, and installer coverage in central and northern India around integrated solar-plus-storage offerings.
  • Pursue domestic-content certifications and eligibility for public-sector and incentive-linked solar programs.
  • Fund the project through a mix of internal cash flow, debt, strategic partners, or potential government manufacturing incentives.