Maruti Suzuki commissions first green hydrogen pilot plant at Manesar

The 300 kW pilot marks a step toward cleaner manufacturing. Maruti Suzuki plans to scale the technology across Haryana and Gujarat, targeting a reduction in its manufacturing carbon footprint from 615,000 tonnes to 266,000 tonnes by FY 2030–31.

Source published First seen Source Outlook Business

The development

Maruti Suzuki India commissioned a 300 kW green hydrogen pilot plant at Manesar. It plans to scale the technology across Haryana and Gujarat, targeting a manufacturing carbon footprint reduction from 6,15,000 tonnes to 2,66,000 tonnes in FY 2030-31.

The numbers

  • 300 kW
  • 6,15,000 tonnes
  • 2,66,000 tonnes
  • FY 2030-31
  • 10-tonnes-per-day
  • FY 2026-27
  • 1-MWh
  • 4 CBG projects
  • ₹561 crore
  • 10 biogas plants

Why it matters to operators and investors

Planned expansion across Haryana and Gujarat creates potential openings for green-hydrogen technology and renewable-power partnerships, with pilot results informing partner selection and rollout commitments.

What to watch next

  • Disclosed hydrogen cost per kilogram, electricity sourcing and operating utilisation.
  • Funded capacity additions or equipment tenders beyond the 300 kW pilot.
  • Site-specific deployment announcements in Haryana and Gujarat.
  • New supplier carbon-reporting or low-carbon procurement requirements.
  • Verified annual manufacturing-emissions reductions toward the stated 266,000-tonne target.
  • Benchmark hydrogen production cost, utilisation and verified emissions savings against existing energy sources and direct electrification.
  • Identify suitable applications at other plants before committing to larger equipment orders.
  • Seek renewable-power arrangements and technology partners that improve utilisation and reduce delivered hydrogen costs.
  • Clarify hydrogen's contribution to the broader manufacturing-emissions target rather than attributing the entire reduction to this pilot.