Maruti Suzuki commissions 300 kW green hydrogen pilot at Manesar

Maruti Suzuki has commissioned its first green hydrogen plant at Manesar, using surplus solar power for manufacturing. The automaker plans to scale the technology across Haryana and Gujarat facilities as part of a broader emissions-reduction programme targeting FY2030-31.

— Source publishedThu, 24 Sept, 2026, 12:46 IST·First seen Thu, 24 Sept, 2026, 12:57 IST·Source The Hindu BusinessLine

What happened

Maruti Suzuki India Limited · Maruti Suzuki commissioned a 300 kW green hydrogen pilot at Manesar, using surplus solar power for manufacturing. It plans to

Key facts

  • 300 kW green hydrogen electrolyzer
  • Carbon footprint reduction target from 615,000 tonnes to 266,000 tonnes by FY2030-31
  • 10-tonnes-per-day biogas plant
  • 1-MWh battery energy storage system
  • Rs 561 crore budget for 4 CBG projects
  • 10 biogas plants planned by Suzuki Motor Corporation partnerships

Why this matters

Maruti Suzuki’s hydrogen, biogas, solar and storage agenda creates partnership and acquisition opportunities across clean-energy supply, electrolyser technology and industrial energy-management capabilities.

What to watch

  • Pilot capacity factor, hydrogen cost per kilogram and percentage of production powered by surplus solar.
  • Announcements of electrolyser procurement, hydrogen storage installations or dedicated renewable additions at Haryana and Gujarat plants.
  • Indian green-hydrogen subsidies, renewable-power wheeling rules and state-level electricity banking policy changes.
  • Evidence that hydrogen displaces natural gas, diesel or LPG in specific manufacturing processes at measurable scale.
  • Maruti Suzuki FY2030-31 emissions milestones, capex guidance and supplier-decarbonisation requirements.
  • Competing automakers' industrial hydrogen deployments and renewable-energy procurement in India.
  • Publish operational data from the 300 kW pilot, including hydrogen output, solar utilisation, replacement fuel and emissions avoided.
  • Evaluate electrolyser expansion tied to new solar capacity and battery storage at Manesar before replicating the model in Gujarat.
  • Prioritise hydrogen for hard-to-electrify heat and industrial processes while using direct electrification for lower-cost loads.
  • Seek central and state incentives, renewable-energy banking arrangements and potential industrial-hydrogen partnerships.
  • Ask major component suppliers to adopt similar renewable-energy and low-carbon thermal-process roadmaps, extending emissions reductions into Scope 3.