Maruti Suzuki commissions 300 kW green hydrogen plant at Manesar

Maruti Suzuki has commissioned a 300 kW green-hydrogen pilot at its Manesar facility, using surplus solar power for manufacturing. The automaker plans to expand clean-energy initiatives across Haryana and Gujarat as it targets a major reduction in manufacturing emissions by FY2030-31.

— Source publishedThu, 24 Sept, 2026, 12:38 IST·First seen Thu, 24 Sept, 2026, 12:42 IST·Source Outlook Business

What happened

Maruti Suzuki India Limited · Maruti Suzuki commissioned a 300 kW pilot green-hydrogen plant at Manesar, using surplus solar power for manufacturing. It plans

Key facts

  • 300 kW green hydrogen electrolyzer plant
  • Carbon footprint reduction target from 615,000 tonnes to 266,000 tonnes
  • 10-tonnes-per-day biogas plant
  • 1-MWh battery energy storage system
  • 4 CBG projects

Why this matters

Maruti Suzuki’s 300 kW green-hydrogen pilot at Manesar provides a test bed for using surplus solar power to cut plant emissions and inform wider deployment across Haryana and Gujarat.

What to watch

  • Announcement of electrolyser capacity expansion beyond the 300 kW pilot or commissioning at a Gujarat facility.
  • Disclosure of annual green-hydrogen production, cost per kg, renewable-power source and specific plant applications.
  • New long-term solar, wind, battery-storage or renewable-energy procurement contracts supporting electrolyser utilisation.
  • State or central subsidies, open-access rules, renewable-energy banking policies or green-hydrogen mandates that improve project economics.
  • Evidence that hydrogen replaces fossil fuel in manufacturing processes rather than serving only demonstration or mobility purposes.